image

borehole drilling geophysical survey ,installation ,maintenance

THE PROCESS OF BOREHOLE DRILLING.

STEP 1: HYDROGEOLOGICAL/ GEOPHYSICAL SURVEY:
We employ both Digital and Old methods.
This gives;
✔️Borehole depth,
✓ Expected yield
✔️Expected Water Quality
TIMELINE: Exercise 1 day, Report 1days

STEP 2: DRILLING APPROVALS AND PERMITS:
The necessary approvals includes; ✓survey stamp ,survey approval ,government permit .

STEP 3: BOREHOLE DRILLING:
The total cost will be calculated based on the recommendations from the Hydrogeological survey results. This includes;
✓Drilling
✓ Gravels
✓Casing
✓Development
TIMELINE: 1days

STEP 4: PUMP TESTING:
Aims to determine the optimum rate at which a borehole should be pumped and yield
TIMELINE: 24 hours

STEP 5: BOREHOLE EQUIPPING AND PUMP INSTALLATION.
This involves installation of submersible pump & motor.
✓pipes
✓ submersible cables,
✓ control panel,
✔️Inverter and solar panels (if solar powered).
TIMELINE: For Electricity 1 Days and 3 days for Solar

With availability of resources a borehole can be drilled within 4to 5Working days.This includes the drilling,casings, testpumping and water analysis plus pump installation.
Call/Whatsapp for any further clarifications.
09065161673 ,08111359 201 ,08070515853

no 1 road 1b Temidire Estate Ajao Bus Stop Agbowo Ibadan Oyo state Nigeria

Share on WhatsApp

Rate us and Write a Review

Cleanliness

Service

Ambience

Price

Browse

Your review is recommended to be at least 140 characters long

image

Show all timings
  • Monday09:00 AM - 05:00 PM
  • Tuesday09:00 AM - 05:00 PM
  • Wednesday09:00 AM - 05:00 PM
  • Thursday09:00 AM - 05:00 PM
  • Friday09:00 AM - 05:00 PM

imageYour request has been submitted successfully.

building Own or work here? Claim Now! Claim Now!
image