borehole drilling geophysical survey ,installation ,maintenance
THE PROCESS OF BOREHOLE DRILLING.
STEP 1: HYDROGEOLOGICAL/ GEOPHYSICAL SURVEY:
We employ both Digital and Old methods.
This gives;
✔️Borehole depth,
✓ Expected yield
✔️Expected Water Quality
TIMELINE: Exercise 1 day, Report 1days
STEP 2: DRILLING APPROVALS AND PERMITS:
The necessary approvals includes; ✓survey stamp ,survey approval ,government permit .
STEP 3: BOREHOLE DRILLING:
The total cost will be calculated based on the recommendations from the Hydrogeological survey results. This includes;
✓Drilling
✓ Gravels
✓Casing
✓Development
TIMELINE: 1days
STEP 4: PUMP TESTING:
Aims to determine the optimum rate at which a borehole should be pumped and yield
TIMELINE: 24 hours
STEP 5: BOREHOLE EQUIPPING AND PUMP INSTALLATION.
This involves installation of submersible pump & motor.
✓pipes
✓ submersible cables,
✓ control panel,
✔️Inverter and solar panels (if solar powered).
TIMELINE: For Electricity 1 Days and 3 days for Solar
With availability of resources a borehole can be drilled within 4to 5Working days.This includes the drilling,casings, testpumping and water analysis plus pump installation.
Call/Whatsapp for any further clarifications.
09065161673 ,08111359 201 ,08070515853
no 1 road 1b Temidire Estate Ajao Bus Stop Agbowo Ibadan Oyo state Nigeria